fazarachmad.wordpress.com

Website:https://fazarachmad.wordpress.com
Dukungan diterima14
Penolakan diterima19
Karma:-4 (Dukungan-Penolakan)



0 mendapatkan lencana

Tidak ada lencana yang ditemukan



Definisi (9)

1

12 Thumbs up   18 Thumbs down

finished good


are goods that have completed the manufacturing process but have not yet been sold or distributed to the end user.
Sumber: fazarachmad.wordpress.com

2

1 Thumbs up   0 Thumbs down

engineering change orders


are used for changes in components, assemblies, or documents such as processes and work instructions. They may also be used for changes in specifications.
Sumber: fazarachmad.wordpress.com

3

1 Thumbs up   1 Thumbs down

ppc


Production, Planning and Control
Sumber: fazarachmad.wordpress.com

4

0 Thumbs up   0 Thumbs down

istilah


Arti
Sumber: fazarachmad.wordpress.com

5

0 Thumbs up   0 Thumbs down

bill of material


 sebuah kumpulan dari material (bahan) yang dibangun membentuk satu Item Barang tertentu
Sumber: fazarachmad.wordpress.com

6

0 Thumbs up   0 Thumbs down

forecasting


Forecasting merupakan kegiatan peramalan permintaan untuk bulan yang akan datang, yang dilakukan oleh bagian Marketing.
Sumber: fazarachmad.wordpress.com

7

0 Thumbs up   0 Thumbs down

load mds


MDS adalah proses untuk mendefinisikan Master Demand Schedule (MDS) dari forecast dan sales order.
Sumber: fazarachmad.wordpress.com

8

0 Thumbs up   0 Thumbs down

load mps


proses untuk menerjemahkan Master Demand Schedule
Sumber: fazarachmad.wordpress.com

9

0 Thumbs up   0 Thumbs down

capacity resource planning


merupakan perencanaan kapasitas dengan basis yang lebih detail daripada RCCP
Sumber: fazarachmad.wordpress.com